Ghurki Trust & Teaching Hospital
Project Overview
Unimix was engaged to completely renovate and upgrade the existing Operating Theatre facilities at GTTH. The aim was to bring the surgical environment up to global standards by incorporating advanced medical infrastructure with an emphasis on infection control, automation, and operational efficiency. The project covered the full scope—from structural upgrades to final finishings.
Key Features & Deliverables
Complete Renovation of OT Block to meet modern healthcare standards
Hermetically Sealed Sliding Doors for maintaining sterility
Antimicrobial Wall Cladding for superior infection control
Integrated Touch Screen Control Panels for lights, HVAC, and communications
Modern Scrub Units with touchless, jointless design
- Solid surface products have invisible monolithic seams
- Aesthetically pleasing but also prevents accumulation of dirt in the seams
- Gently sloping shapes, which makes cleaning the sinks even easier
- The sinks can be installed separately or combined into units
Anti-bacterial, Anti-static Flooring for safety and hygiene
Positive Pressure Air Filtration System (99.99%) ensuring clean air
Coved Junction Finishes between walls, floors, and ceilings for easy maintenance
Project Impact
The project significantly elevated the hospital’s surgical environment, ensuring compliance with the highest standards of infection prevention and patient safety. With streamlined workflows and state-of-the-art medical technology, GTTH now offers a safer, cleaner, and more efficient setting for both patients and surgical teams. The upgrade not only improved the hospital’s operational capabilities but also reinforced its position as a leading institution for advanced medical care in Pakistan.




